Has taken Lockdown two and three to build from castings. Fortunately was able to obtain a S/H 504 boiler recently off EBay which was always going to be an issue due to current cost of new ones.
Just the main steam pipe to make and lag and water level gauge to fit, although the plant also has the facility to run off compressed air from the turret.