Pansy Boiler Topfeed

Advert

Pansy Boiler Topfeed

Home Forums Locomotives Pansy Boiler Topfeed

Viewing 4 posts - 1 through 4 (of 4 total)
  • Author
    Posts
  • #1131
    Robert Starling
    Participant
      @robertstarling75989
      Advert
      #100014
      Robert Starling
      Participant
        @robertstarling75989

        Would like information from builders of Pansy how they fitted the Boiler Topfeed. Did they fit as per drawing, which possibly may not be advisable these days as it involves screwing directly into the boiler shell, or have they developed a different method ?

        #100049
        julian atkins
        Participant
          @julianatkins58923

          hi robert,

          you can make the fitting out of solid then silver solder to the boiler. i would be inclined to fit a phos bronze bush into the boiler and screw the fitting into that. or you can have a look at keith wilson's DUKEDOG and BULLDOG design.

          the main problem with the PANSY top feed is the check valves being covered up by the pannier tanks…a huge job to remove if the clacks play up. on mine i followed other examples of the prototype and fitted the clacks into bushes in the backhead with pipes going forward to the front of the barrel.

          the top feed isnt the only problem with the boiler fittings… the backhead fittings and blowdown valves were all an after thought partly caused by LBSC's use of the SPEEDY boiler backhead and his row with ME at the time. the blowdown valve arrangement is atrocious as is the lack of a proper manifold/turret. on mine i fitted a proper manifold/turret of GWR type into a bush silver soldered onto the end of the firebox outer wrapper. due to the drawings showing too short a barrel, most builders cant do this, but you can always move the cab forward a bit or better still lengthen the barrel to the correct length. i fitted a 'vertical' blowdown valve on the backhead just above the foundation ring. LBSC's afterthought arrangement weakens the frames at their weakest point already.

          cheers,

          julian

          #100114
          julian atkins
          Participant
            @julianatkins58923

            hi robert,

            i dont know if your drawings have been 'modernised', but your concerns also apply to all the other stuff screwed into the boiler plates on the original PANSY boiler drawings such as the wet header for the steam pipe on the smokebox tubeplate and the regulator bush on the backhead. all should have proper phos bronze (unleaded) bushes silver soldered.

            aart from the belpaire firebox stays which are caulked with comsol or silver soldered in position, everything else fitted to the boiler should have proper bushes these days.

            cheers,

            julian

          Viewing 4 posts - 1 through 4 (of 4 total)
          • Please log in to reply to this topic. Registering is free and easy using the links on the menu at the top of this page.

          Advert

          Latest Replies

          Home Forums Locomotives Topics

          Viewing 25 topics - 1 through 25 (of 25 total)
          Viewing 25 topics - 1 through 25 (of 25 total)

          View full reply list.

          Advert

          Newsletter Sign-up