      Hi – I am building a 5" gauge Don Young Black Five and am considering using in-line boiler feed check valves mounted horizontally beneath the side platforms in place of having them as an integral part of the top feed fitting as specified by DYD. This arrangement as used by Martin Evans in his 7.25" Highlander (ME 3 February 1967) and has obvious advantages in terms of accessibility and maintainence issues but I am not sure just how this works out in practice. For example is there an issue with keeping the balls on their seats if mounted in the horizonatal position?. I would therefore be very interested in hearing the views of other builders who have had some practical experience in fitting and running with horizontally mounted check/clack valves before taking any further decisions.

      Apolgies if this query sounds a little familiar but my previous posting was mis-placed and may lave limited its general readership

      Advert
      #1921
      Greensands
      Participant
        @greensands
      Viewing 2 posts - 1 through 2 (of 2 total)
      • Please log in to reply to this topic. Registering is free and easy using the links on the menu at the top of this page.

      Advert

      Latest Replies

      Home Forums Locomotives Topics

      Viewing 25 topics - 1 through 25 (of 25 total)
      Viewing 25 topics - 1 through 25 (of 25 total)

      View full reply list.

      Advert

      Newsletter Sign-up