Thank you all for your interest. I have emailed the .dwg and .pdf files.
It appears that imperial materials have been used in a number of places but can probably be replaced with metric stock. I don’t have the small imperial hex key required to dismantle the plunger assembly but I am sure you can work out what it will be like inside.