Very interesting reading about the Q1 build. I note that a fuseable plug has been specified as an important feature. I think that there is no soft solder in the construction of the boiler so as I understand, this makes the fuseable plug redundant as the boiler now has a much higher failure temperature than if soft solder were used. What are your thoughts?
It is NOT related to soft solder used in construction, it is there to ensure protection IF the crown is not covered with water for whatever reason. There is enough confusion as to whether or not it is justified on our scales without clouding the issue by yet another alleged aspect against their use.
David, While ever the firebox crown is covered with water the plug is safe , I think it has the same effect as trying to solder a pipe while it has water in it im sure you know it cant be done.
Thanks for these comments. Many well known small locomotives do not have fuseble plugs (I think Metro, Rob Roy, Mona, Tich… ), would it therefore be an improvement to fit one during construction? Thanks, Dave
Author
Posts
Viewing 5 posts - 1 through 5 (of 5 total)
Please log in to reply to this topic. Registering is free and easy using the links on the menu at the top of this page.