Firebox stays

Advert

Firebox stays

Home Forums Traction engines Firebox stays

Viewing 3 posts - 1 through 3 (of 3 total)
  • Author
    Posts
  • #372010
    Maurice Cox 1
    Participant
      @mauricecox1

      I recently acquired a part built Fowler showman's engine in 1 1/2" scale. It includes a silver soldered boiler which is complete except for soldering the fire box stays, inside and out. Which would it be best to do first, inside or out? Also, on each side of the fire box are five copper bushes to attach the horn plates, threaded into the inner and outer wrappers, and also wanting soldering. They are of copper, and drilled right through. I was considering making bronze ones with blind holes tapped 4B.A. Is this a reasonable idea please?

      Thanks. Maurice

      Advert
      #2900
      Maurice Cox 1
      Participant
        @mauricecox1
        #372012
        JasonB
        Moderator
          @jasonb

          It is easier to clamp the hornplates onto the boiler and spot through the 5 holes than try and mark out for matching 4BA clearance holes in the hornplates

        Viewing 3 posts - 1 through 3 (of 3 total)
        • Please log in to reply to this topic. Registering is free and easy using the links on the menu at the top of this page.

        Advert

        Latest Replies

        Home Forums Traction engines Topics

        Viewing 25 topics - 1 through 25 (of 25 total)
        Viewing 25 topics - 1 through 25 (of 25 total)

        View full reply list.

        Advert

        Newsletter Sign-up