Emma-Victoria

Advert

Emma-Victoria

Home Forums Drawing Errors and Corrections Emma-Victoria

Viewing 2 posts - 1 through 2 (of 2 total)
  • Author
    Posts
  • #234163
    Henry Wood
    Participant
      @henrywood50588

      To builders of Emma-Victoria, to make easier access when notching up the Valve Gear whilst on the run,I moved the Reversing Stand back 3/4" and re-drilled and tapped the frame 4BA to accept hex. head setscrews. This meant that the Reach Rod was extended by 3/4" making the hole centers 813/16". Another advantage of using tapped holes is that it keeps maximum clearance for the firebox inside the frames. Unfortunately I did not alter my pencil drawings to reflect this at the time, hence this was overlooked when re-drawing on Turbo-Cad.

      I hope this small change will not be any problem to builders.

      Henry

      Advert
      #38798
      Henry Wood
      Participant
        @henrywood50588

        Reversing Stand re-positioning

      Viewing 2 posts - 1 through 2 (of 2 total)
      • Please log in to reply to this topic. Registering is free and easy using the links on the menu at the top of this page.

      Advert

      Latest Replies

      Viewing 25 topics - 1 through 25 (of 25 total)
      Viewing 25 topics - 1 through 25 (of 25 total)

      View full reply list.

      Advert

      Newsletter Sign-up