Hi all,
The time has come to take on the challenge of building Minnie’s boiler – so I thought I would start a thread in which to post what I suspect will be numerous questions.
I successfully completed the ME vertical boiler last year as a practice project for this, but there is no doubt the extra complexity of a traction engine boiler is intimidating – compounded by the fact that the consensus seems to be that the instructions are far from perfect.
I’ve studied some of the old threads and I think I understand the main issues with Mason’s method – but will consult here with the wise heads of the forum at each stage to make sure my approach is sensible.
I don’t intend to get the boiler tested – I am not a member of a club, and my work commitments mean that it is not practical for me to join one. I fully appreciate that there are considerable benefits in having an inspector check your work at each stage of the build – but in this case I will have to manage without.
So in terms of deviations from Mason’s instructions, I will be silver soldering the stays – so will change the build order so that the back plates go on after the stays are in place. For stays I will be using bronze for the horn plate stays and copper rivits for the rest. Since I am not going to get the boiler tested I think I will leave the steam block as is. I also noted that some members recommended soldering the front foundation ring early on.
In terms of kit – I have a vermiculite hearth from CupAlloys and some fireblanket for extra insulation for the job when needed. My torch is a Sievert with a 7.7 and 26kw and cyclone burners. For solder I intend to use 438 and 455, flux easy flow and HT5.
So – I’m fast approaching my first cook-up: I have the tube pads, pump pads, barrel and throat plate prepped. (The boiler kit has come from Blackgates – so the plates are already flanged.)
Whilst Mason recommends doing all of this in one hit, my current thinking is:
- Solder on the barrel pads and pump pad first with 438 / HT5. 26kw burner
- Solder on the front foundation ring to the throat plate with 438/HT5. Foundation ring to be wider than the water space and profiled around the flanged firebox frontplate. 7.7 kw burner
- Solder the barrel to the throat plate and wrapper with 438 / HT5. 26kw burner
Any thoughts and advice would be appreciated. The front foundation is the main departure here so any comment on that in particular would be welcome. Will this cause any problems soldering the front stays for example? Also is solder / flux /burner choice sensible?
Cheers
Dom