I am about to braze up a 4″ vertical boiler similar to the Tina engine and boiler avertised in the magazine
What is the best order of work ie should I braze up the tubes and tube plates and then attempt to fit them into the boiler tube?
Alternatively is the best way forward to assemble the complete boiler and braze the whole thing in one operation
Your expert advise would be most welcome