I haven't built one myself, but IIRC, my pal said that there was a discrepancy bwtwen the position of the blowdown boss on the boiler and the hole in the frames for it to poke through – so probably best to mark one off from the other.
Author
Posts
Viewing 4 posts - 1 through 4 (of 4 total)
Please log in to reply to this topic. Registering is free and easy using the links on the menu at the top of this page.