Hello Mike,
From memory the machining sequence went something like this.
The Face and Outside diameter where the dial goes were turned. The main bore was drilled, bored and reamed to take the Oilite bush. Then the counterbore to clear the input gear was also machined at this point.
The part was then reversed in the chuck, (I used soft jaws for this operation), the part is then brought to length. The boss diameter was then machined, along with the blend radius and chamfer. The thread diameter is then roughed out and the undercut for the thread machined to size.
Griping on the roughed out thread diameter in a chuck on the milling table the Idler gear pocket was machined using coordinates. The part was then mounted on a spigot mandrel by the main bore, (dial end nearest chuck). The thread diameter is finished machined and the thread screwcut to the 3 wire dimension in the text.
Hope these notes help?
Regards
Gray,