Recently started a Vulcan beam engine and not having done a beam engine before, but had read a few builds and comments etc.
Drilling the beam – and the bosses for the pivot points were not all positioned well, similar to other builds. – So If drilled as per dimension for mine, the hole for the parallel motion link would not have been centred in the boss. Drawings indicated 1-7/8 equal spaced between centre pivot and end pivot. Parallel motion links are all 1-7/8 including the 'tie' links to the entablature.
After the adjustment to centre the pivot in the boss, dimensions are now 1.910 (end closest to end pivot) and 1.840 from that to the centre pivot.
I assume that lengths of parallel motion links all now need to be the same, at 1.910. I also assume this includes the (tie) links that anchor the parallel motion to the entablature?
Any guidance on this is appreciated.