Baldwin Gas Mechanical more progress

Advert

Baldwin Gas Mechanical more progress

Home Forums Work In Progress and completed items Baldwin Gas Mechanical more progress

Viewing 15 posts - 1 through 15 (of 15 total)
  • Author
    Posts
  • #530758
    Steve Addy
    Participant
      @steveaddy35670

      Got a bit further with the Baldwin, namely cab windows and window handle model rendering below, the castings now exist for the conduit fittings and I'm getting on with the bodywork. The panel under the tank is now fitted.2021-02-09-10-00-52am handle v3 render.jpg

      Edited By Steve Addy on 28/02/2021 16:12:53

      Advert
      #31351
      Steve Addy
      Participant
        @steveaddy35670
        #530759
        Steve Addy
        Participant
          @steveaddy35670

          Conduit castings  They are designed to take 8mm heating pipes for the conduit.

          2021-02-12 elbows 3.jpg

          Edited By Steve Addy on 28/02/2021 16:17:23

          #530760
          Steve Addy
          Participant
            @steveaddy35670

            Oak cab window frames

            2021-02-19 21.57.07.jpg

            #530762
            Steve Addy
            Participant
              @steveaddy35670

              Under tank panel bolted on with all dummy rivets in, there are some button heads above the doors which are not fitted as they are in the post. The under chimney panel will be replaced as this first effort is not quite right, but you get the idea.

              2021-02-27 rivets all in ut panel.jpg

              #530763
              Phil Whitley
              Participant
                @philwhitley94135

                Stunning work, what is the sca;e?

                #530764
                Steve Addy
                Participant
                  @steveaddy35670

                  Thanks Paul, a 7.25" gauge. Scale is 1:3.26. There are other pictures of my chuffing about in the work in progress if you're interested.  Here and here

                  Steve

                  Edited By Steve Addy on 28/02/2021 16:21:23

                  Edited By Steve Addy on 28/02/2021 16:24:38

                  #535871
                  Steve Addy
                  Participant
                    @steveaddy35670

                    Have got a bit further over the last four weeks. The conduit castings and handles arrived today, the latter have been fitted this afternoon. A revised under chimney panel is fitted with a load of M2 button heads, along with the chimney, lamp and front sand fillers.  I was impressed with a roll forming tap used to tap the body frames under power.  Never used one before, but they're brilliant.

                    2021-03-15 22.35.57 lamp bolted.jpg

                    Edited By Steve Addy on 24/03/2021 19:52:20

                    Edited By Steve Addy on 24/03/2021 19:53:08

                    #535872
                    Steve Addy
                    Participant
                      @steveaddy35670

                      Drilling the doors for the various strips which need riveting on.

                      2021-03-17 drilling door strips.jpg

                      #535873
                      Steve Addy
                      Participant
                        @steveaddy35670

                        Investment castings arrived today.

                        2021-03-24 12.54.54.jpg

                        #535874
                        Steve Addy
                        Participant
                          @steveaddy35670

                          Cab window handles seen previously as a render now exist in white bronze.

                          2021-03-24 12.57.31.jpg

                          #535875
                          Steve Addy
                          Participant
                            @steveaddy35670

                            Window handles fitted.

                            2021-03-24 18.45.10.jpg

                            #535879
                            Jeff Dayman
                            Participant
                              @jeffdayman43397

                              Beautiful detail work Steve! well done.

                              #536046
                              Howard Lewis
                              Participant
                                @howardlewis46836

                                Superb work, Steve!

                                Thanks for the updates

                                Howard

                                #536786
                                Steve Addy
                                Participant
                                  @steveaddy35670

                                  Thanks chaps – I ordered the taps and tapping drills for M1 and M1.2 yesterday. I've already received the stainless cheese head screws for the elbow lids. It's going to make me sweat fitting them.

                                  I've modified an air chisel hammer this last week to drive rivets. Seems to work with snap heads with a 1.7 times diameter stick through. The drawing seemed to be overkill, but at least I got the hole and slot in the right place for it to fit together nicely.

                                  2021-03-25_17.12.29[1].jpg

                                  Kind regards

                                  Steve

                                Viewing 15 posts - 1 through 15 (of 15 total)
                                • Please log in to reply to this topic. Registering is free and easy using the links on the menu at the top of this page.

                                Advert

                                Latest Replies

                                Viewing 25 topics - 1 through 25 (of 25 total)
                                Viewing 25 topics - 1 through 25 (of 25 total)

                                View full reply list.

                                Advert

                                Newsletter Sign-up