Not an exact location needed, but preferably as close to the top of the foundation ring as practicable and in from the edge to clear chain drum and damper flap workings to aid maximum draining.
Mine works out to about 1/2" (12.7mm) up from the bottom of the foundation ring and 1/2" in from the wrapper side to the centre of the bush (mine is 7/16" did and comfortably clears the stay above it-

Your boiler is coming on well.
Edited By Richard S2 on 04/09/2020 23:17:42