SPEEDY 5inch boiler stays

Advert

SPEEDY 5inch boiler stays

Home Forums General Questions SPEEDY 5inch boiler stays

Viewing 3 posts - 1 through 3 (of 3 total)
  • Author
    Posts
  • #86697
    Speedy Builder5
    Participant
      @speedybuilder5

      Can anyone help. Following LBSC's writings in the MAP book 1978 and sheet 5 'Mechanics' there are no dimensions for placing the 1/8" stays on the backhead / fire/door plate. Reading from the text, there are 47 stays each side of the firebox, 6 in the throat plate (All OK so far) and 3 in the wrapper. Now by my interpretation these would be in the backhead / door plate – BUT 3 do not look like enough. 1/8" stays are drawn at between 3/4 to 11/16" pitch. Thus there should be at least 10 to support the doorplate.

      Can anyone shed a bit more light on the positioning of these stays? I intend to use 1/8" copper rivets and silver solder in place instead of using 5Ba/1/8 x 26 as specified in the drawings / text.

      Advert
      #22037
      Speedy Builder5
      Participant
        @speedybuilder5

        Missing stays

        #86939
        Speedy Builder5
        Participant
          @speedybuilder5

          Does anyone own a Speedy who could have a look at their backhead/ fire door plate and count the number of stays please ?

        Viewing 3 posts - 1 through 3 (of 3 total)
        • Please log in to reply to this topic. Registering is free and easy using the links on the menu at the top of this page.

        Advert

        Latest Replies

        Home Forums General Questions Topics

        Viewing 25 topics - 1 through 25 (of 25 total)
        Viewing 25 topics - 1 through 25 (of 25 total)

        View full reply list.

        Advert

        Newsletter Sign-up