Hello John.
The size of the beam and the length is a factor.
If you have access to a machine to lift the beams then they can be cast in shuttering on the ground.If not they will need to be cast in situ in a supported shutter.
The mix for concrete for beams (shovels)10 gravel 5 Sharp sand 2 cement or if it is mixed ballast I use 7 ballast 1 cement.
The reinforcing bar needs 2 longitudal rods top and bottom with bar bent into a square at 300mm centres tied with wire to the 4 rods to form a cage.Keep the cage 25mm up from the bottom/side&top .Hire a vibrating poker to remove the air .Hope this helps
Francis