Having finished the turret a few days ago I've realised that I've not been keeping this thread up to date, so to continue.
I assembled the turret and mounted it in the tailstock and utilising the spring detent l was then able to rotate the front casting to pilot drill the six holes required for the tool holders.

Having opened these holes up to 3/8" reaming size l discovered that my only machine reamer of that size was blunt on the tip, for a hole only 5/8" deep a sharp one was paramount, so I had to wait a few days whilst a new one was ordered. Note to self – check these things beforehand!

The final machining operation on the casting was to drill the six holes on the periphery for the locking screws that will retain the various adapters and toolholders. This was done with my rotary table mounted vertically on the drilling machine.

Having tapped the locking screws holes, the turret was then reassembled and fitted with some of the adapters/ tool holders that I'd previously made for the final photo.

Having spent all this time making this turret l really wonder how much use it's going to get, but that aside it has been a very interesting exercise although I'm not impressed by how much time I've had to spend since in stripping and cleaning the lathe to remove all the cast iron dust.
Phil